HISTORY

   Arslan Eloksal was established in 1970 as an average enterprise in 250 m² covered area and started to serve about Polisage and Anodising  and then,  moved to new Alibeyköy foundations which has 3500 m² covered section in 5250 m²area in 1973.
          
          In 1974, Arslan Eloksal has started to use its 400 ton process controlled extrusion press and produced joinery auxiliary profiles.In 1975, by begining to use the 1200 ton process controlled extrusion press, the capacity and production has  increased and production of all aluminium profiles both moulding and  anodising  have been achieved as integrated. In 1980, Arslan Eloksal has changed its name as Arslan Alüminyum San. ve Tic. Ltd. Şti. and decided to move to the Industrial Area of Bilecik because there was not enough place for growing and related to  the decisions of local management and then the company started the construction of the new establishment in 1986.
           
          In 1988, 11.000 m² area of factory estate which is 40.000 m² was covered and die production, press  department, static powder coating  and anodising  institutions have been completed and started  production. After these new departments started to produce , in 1992, 5300 m²  area was covered and new anodising  department which has 48000 amp/h capacity have been established.Meanwhile,  the construction of the 1600 ton process controlled extrusion press has begun but could be started to use in 1999. In 2000 , 6000 m² area has been covered and the static powder coating institution which has 275.000 m2/month capacity has been started to produce.In 2004 , the new area which has 85.000 m² open space and 3.500 m² covered space in the Second Industrial Area of Bilecik has been taken.By being carried  die production department to the new place our die production has been increased.Besides, in the 2nd quarter of 2004, aluminium processing centre and various mechanical threatment machines are started to use  in this foundation.In the 6th month of 2004, the third press which is 1100 ton process controlled extrusion press has been started to run in the foundation.
          
          In 2005, film covering foundation has been taken and has started to make appearence of wood, granite and marble effect.
 
          In 2006,the factory’s 10.000m² part that is in the Second Industrial Area has completed and 1600 ton process controlled fourth pres, has been taken and started to produce.In  the 2nd term of 2006,2750 ton process controlled fifth pres has been taken and also this pres started to produce.

          The 4th  quarter of 2007, 4000 ton process controlled extrusion press which has been given order in 2006 is going to set up and will be in process 1th quarter of 2008.Because of the increase in production,company has decided to expand packaging and wrapping department.Therefore,the construction of this 10.500 m2 area will be completed the 4th quarter of 2007.In addition, foundry project has been started in 2007.Capacity of the foundry is 92.000 ton/year, the  amount of 24.000 ton/year will be in process June of  2008.

.         When all of these investments are completed, approximately June of 2008. Arslan Aluminyum’s  theoretical capacity is going to be 4500 ton/month for aluminium profil, 1450 ton/month for anodising, 750 ton/month  for powder coating, 375 ton/month for decorative film coating unit and also for producing aluminium billet 2000ton/month.

THEORETICAL CAPACITIES  

EXTRUSION CAPACITY

EXTRUSION PRESSES
PROCESS POWER
ton
MANUFACTURING CAPACITY
ton/month

PRESS 1

1200

350

PRESS 2

1600

500

PRESS 3

1100

350

PRESS 4

1600

600

PRESS 5

2750

1000

PRESS 6

4000

1700

TOTAL MANUFACTURING CAPACITY  

4500



ANODISING CAPACITY

ANODISING

ANODISING CAPACITY

 

AMPER

ton/month

m²/month

ANODISING 1

48.000

575

240.000

ANODISING 2

48.000

875

350.000

TOTAL A.CAPACITY

96.000

1.450

590.000


Our enterprise aims 450 ton/month profiles with anodising . Other 925 ton/ay anodising capacity will be processed buy cut.

STATIC COLOR CAPACITY

STATIC COLOR

CAPACITY

ton/month

m²/month

Institution 1

250

100.000

Institution 2

500

200.000

TOTAL S.C. CAPACITY

750

300.000

 FILM COVERING CAPACITY

 
m²/month
ton/month
Institution
150.000
375

 

** This process will be taken into the enterprise in 2008.




FACTORY PICTURES

  • descriptiondescription
  • descriptiondescription
  • descriptiondescription
  • descriptiondescription
  • descriptiondescription
 

HOMEPAGE